The trust placed in euskalforging from the beginning of the offshore sector has made it the world’s No. 1 manufacturer of flanges for:
In a sector where delays in the construction of the wind farm, lengthy maintenance periods or failures in the equipment have a high economic impact, the supplied products must comply with the strictest technological requirements, guaranteeing the delivery time. This is why the clients continually trust in euskalforging to be able to guarantee the mechanical properties required in the most challenging environments, always meeting the agreed deadlines.
Each offshore wind farm has different features as regards temperature, depth and sea bed, all of which require a particular foundation in each case. The joint work between the client's engineering departments and euskalforging's technical office determines the material grade (adjusting its chemical composition) and the production process, adapting them to the requirements of the flanges used in the foundation.
euskalforging has the capacity to meet the high technical demands of this sector in weldable steels and sections over 250 mm, diameters over 5,000 mm and heights over 200 mm:
euskalforging’s state of the art production equipment positions the company as a market leader in the manufacturing of the critical components that determine the performance of offshore wind turbines
euskalforging’s leadership is reflected in the fact that it is the main supplier of the components listed below for turbines between 3 MW and 8 MW (currently the most powerful turbine in the commercial phase).
euskalforging manufactures the following components:
Year: 2024
Destination: United Kingdom
End client: Scottish Power
Renewables
Grade: S355NL
Scope:
Completion period: 17 months
Year: 2024
Destination: USA
End client: Joint venture between
Equinor and bp
Grade: S355NL
Scope:
Completion period: 7 months
Year: 2023
Destination: France
End client: Ocean Winds
Grade: S355NL
Scope:
Completion period: 6 months
Year: 2023
Destination: United Kingdom
End client: SSE Renewables, Equinor and Vårgrønn
Grade: S355NL
Scope:
Completion period: 12 months
Year: 2022
Destination: United States
End client: Avangrid-Iberdrola
Grade: S355NL
Scope:
Completion period: 5 months
Year: 2022
Destination: UK
End client: SSE
Grade: S355NL Z35
Scope:
Completion period: 11 months
Year: 2021
Destination: Germany
End client: Iberdrola
Grade: S355NL +N
Scope:
Completion period: 6 months
Year: 2021
Destination: UK
End client: SSE
Grade: S355NL Z35
Scope:
Completion period: 15 months
Year: 2020 / 2021
Destination: The Netherlands
End client: Vattenfall
Grade: S355NL Z35
Scope:
Completion period: 8 months
Year: 2020
Destination: --
End client: Siemens Gamesa Renewable
Grade: 42CrMo4
Scope:
Completion period: 2 months
Year: 2019/2020
Destination: France
End client: General Electric
Grade: 42CrMo4
Scope:
Completion period: 6 months
Year: 2020
Destination: France
End client: Éolien Maritime France
Grade: S355NL
Scope:
Completion period: 6 months
Year: 2020
Destination: UK
End client: Ørsted
Grade: S355NL +N
Scope:
Completion period: 3 months
Year: 2019
Destination: Denmark
End client:Vattenfall
Grade: S355 NL +N
Scope:
Completion period: 3 months
Year: 2019
Destination: Taiwan
End client:wpd
Grade: S355 NL +N
Scope:
Completion period: 3 months
Year: 2019
Destination: Belgium
End Client: Consortium of Otary RS, Electrabel and Eneco Wind Belgium
Grade: S355NL
Scope:
Completion period: 6 months
Year: 2018/2019
Destination: Netherlands
End Client: The Blauwwind consortium
Grade: S460QL+QT
Scope:
Completion period: 6 months
Year: 2018/2019
Destination: Portugal
End Client: EDP
Grade: S355NL +N
Scope:
Completion period: 2 months
Completion period: 3 months
Year: 2015
Destination: UK
End client: e.on
Grades: S355 G10
Scope:
Completion period: 6 months
Year: 2015
Destination: Germany
End client: Iberdrola
Grades: S355 NL
Scope:
Completion period: 4 months
Year: 2015
Destination: Global
End client: Multiple
Grades: 42CrMo4
Scope:
Completion period: 2 months
Year: 2015
Destination: UK
End client: Statoil
Grades: S355 NL
Scope:
Completion period: 3 months
Year: 2015
Destination: Global
End client: Multiple
Grades: Confidential
Scope:
Completion period: 2 months
Year: 2015
Destination: USA
End client: Deeperwater Wind; LLC
Grades: S355J2 / S355NL
Scope:
Completion period: 3 months
Year: 2014
Destination: UK
End client: RWE Innogy
Grades: S355 NL
Scope:
Completion period: 1 month
Year: 2014
Destination: Netherlands
End client: ENECO
Grades: S355 NL
Scope:
Completion period: 4 months
Year: 2014
Destination: Global
End client: Multiple
Grades: 42CrMo4
Scope:
Completion period: 2 months
Year: Since 2012
Destination: Global
End client: Multiple
Grades: S355 NL
Scope:
Completion period: 2 months