noticias

Programa Concepto subvencionable Organismo Expediente Importe Subvencionable Duración
AYUDAS A LAS ACTUACIONES DE EFICIENCIA ENERGÉTICA EN PYMES Y GRANDES EMPRESAS DEL SECTOR INDUSTRIAL REESTRUCTURACION DE HORNOS DE FORJA Y TRATAMIENTO PARA LA RECUPERACIÓN DE CALOR RESIDUAL GOBIERNO VASCO 441-AEE/2019 25.760,36 € 2023-2024
HAZITEK PROYECTOS I+D (S420NL) GOBIERNO VASCO ZL-2023/00050 55.189,68 € 2023
HAZITEK PROYECTOS I+D (BRD + 6,5 +) GOBIERNO VASCO ZL-2022/00094 40.780,66 € 2022
HAZITEK PROYECTOS I+D (S420NL) GOBIERNO VASCO ZL-2022/00667 59.427,21 € 2022
HAZITEK PROYECTOS I+D (BRID+6,5) PLUS GOBIERNO VASCO ZL-2021/00287 53.101€ 2021
HAZITEK PROYECTOS I+D (BRID+6,5) GOBIERNO VASCO ZL-2020/00103 84.447€ 2020
HAZITEK PROYECTOS I+D (BRID+6,5) GOBIERNO VASCO ZL-2019/00705 62.802€ 2019
HAZITEK PROYECTOS I+D (BLOOMPRO) GOBIERNO VASCO ZE-2018/0002 48.097€ 2018-2019
IDAE INVERSIÓN EN QUEMADORES REGENERATIVOS DE GAS MINISTERO DE INDUSTRIA, COMERCIO Y TURISMO FN-PGESI-2018-001631 192.720€ 2018-2019
REINDUSTRIALIZACIÓN Y FOMENTO DE LA COMPETITIVIDAD 2015 INVERSIÓN EN INCREMENTO DE LA CAPACIDAD INDUSTRIAL Y DESARROLLO DE NUEVOS PRODUCTOS MINISTERO DE INDUSTRIA, COMERCIO Y TURISMO RCI-090000-2015-1 5.000.000€ 2015
AYUDAS A LAS ACTUACIONES DE EFICIENCIA ENERGÉTICA EN PYMES Y GRANDES EMPRESAS DEL SECTOR INDUSTRIAL SISTEMA DE RECUPERACIÓN DE CALOR RESIDUAL EN HORNOS DE FORJA GOBIERNO VASCO 165-AEE/2019 25.500 € 2020

Noticias

Euskalforging continues its role as manufacturer of seamless rolled rings for several application within the offshore wind sector and has provided rings for the the largest hammer ever built, the MHU3500S. This hydraulic hammer offers a massive 3500 kJ of power and satisfies all requirements of offshore pile foundation installation, even future requirements to cover up to 7,5 m pile sleeve

The Danish Kriegers Flak will be developed by Vattenfall company with 72 Siemens Gamesa turbines.

euskalforging has been awarded to manufacture flanges for the 5 floating platforms of Kincardine wind farm, that will be installed some 15 kilometres southeast of Aberdeen and will support 9.6MW wind turbines. With this project, euskalforging keeps strengthening its position as main supplier of flanges for floating platforms.

euskalforging has been supplier of flanges for the Transition Pieces and Monopiles for the SeaMade wind farm, located approximately 50 km off the coast of Ostend (Belgium). The 487-Megawatt offshore wind farm will comprise of 58 Siemens- Gamesa turbines each with an individual installed capacity of 8.4 MW and will be placed on monopile foundations.

euskalforging  has finished the production of rings for the 6 last cocke drums that have been launched in the market worldwide.