noticias

Programa Concepto subvencionable Organismo Expediente Importe Subvencionable Duración
AYUDAS A LAS ACTUACIONES DE EFICIENCIA ENERGÉTICA EN PYMES Y GRANDES EMPRESAS DEL SECTOR INDUSTRIAL REESTRUCTURACION DE HORNOS DE FORJA Y TRATAMIENTO PARA LA RECUPERACIÓN DE CALOR RESIDUAL GOBIERNO VASCO 441-AEE/2019 25.760,36 € 2023-2024
HAZITEK PROYECTOS I+D (S420NL) GOBIERNO VASCO ZL-2024/00115 45.771,19 € 2024
HAZITEK PROYECTOS I+D (S420NL) GOBIERNO VASCO ZL-2023/00050 55.189,68 € 2023
HAZITEK PROYECTOS I+D (BRD + 6,5 +) GOBIERNO VASCO ZL-2022/00094 40.780,66 € 2022
HAZITEK PROYECTOS I+D (S420NL) GOBIERNO VASCO ZL-2022/00667 59.427,21 € 2022
HAZITEK PROYECTOS I+D (BRID+6,5) PLUS GOBIERNO VASCO ZL-2021/00287 53.101€ 2021
HAZITEK PROYECTOS I+D (BRID+6,5) GOBIERNO VASCO ZL-2020/00103 84.447€ 2020
HAZITEK PROYECTOS I+D (BRID+6,5) GOBIERNO VASCO ZL-2019/00705 62.802€ 2019
HAZITEK PROYECTOS I+D (BLOOMPRO) GOBIERNO VASCO ZE-2018/0002 48.097€ 2018-2019
IDAE INVERSIÓN EN QUEMADORES REGENERATIVOS DE GAS MINISTERO DE INDUSTRIA, COMERCIO Y TURISMO FN-PGESI-2018-001631 192.720€ 2018-2019
REINDUSTRIALIZACIÓN Y FOMENTO DE LA COMPETITIVIDAD 2015 INVERSIÓN EN INCREMENTO DE LA CAPACIDAD INDUSTRIAL Y DESARROLLO DE NUEVOS PRODUCTOS MINISTERO DE INDUSTRIA, COMERCIO Y TURISMO RCI-090000-2015-1 5.000.000€ 2015
AYUDAS A LAS ACTUACIONES DE EFICIENCIA ENERGÉTICA EN PYMES Y GRANDES EMPRESAS DEL SECTOR INDUSTRIAL SISTEMA DE RECUPERACIÓN DE CALOR RESIDUAL EN HORNOS DE FORJA GOBIERNO VASCO 165-AEE/2019 25.500 € 2020

Euskalforging awarded full supply of the foundation flanges for the Norther Offshore Wind Farm project.

euskalforging, a world leading manufacturer of seamless rolled rings up to ∅10.000mm and 80Tn of input weight, with  turning, drilling and gear cutting  capabilities and  three manufacturing plants in the North of Spain, has signed a contract with Sif Group to supply 135 flanges for the foundations  & Sub Station for the Norther Offshore Wind Farm.

The project consists of up to 44 MHI Vestas wind turbines V164-8.0 with a monopile design foundation & the Sub Station. Each turbine is rated at 8.4 MW giving a maximum generating capacity of up to 370 MW.

The offshore wind farm , developed by Elicio, Eneco and Diamond Generating Europe, will be built in the Belgian North Sea, within the Exclusive Economic Zone of Belgium, around 23 km from the port of Zeebruges covering an area of 38 square kilometres. This wind farm will supply energy to about 400.000 households.

Under the terms of the contract, euskalforging will fabricate and deliver to Sif Group 135 flanges with an outer diameter above 6.000mm that will be integrated in the foundation & sub Station.  Deliveries will be adjusted to meet customer’s manufacturing schedule.

The project represents another milestone for euskalforging and reinforces its technological leadership and project execution capabilities in the offshore wind market after participating in more than 34 offshore wind farms in the last few years.