oil-gas

Rings for winches, oil&gas platforms, FPSO, heat exchangers, coke drums, autoclaves, reactors, valves, closures, …

Know How

euskalforging, world leader in the manufacture of rolled rings, has extensive experience in the Oil & Gas sector. This sector demands the highest technical requirements, which euskalforging is capable of fulfilling, thanks to the following:

Strategic location

Agreements signed by euskalforging allows the company to have at the immediate surroundings of its Sestao plant, quays to load directly onto the boat, whether by river transport to the port of Bilbao, or by river/sea transport to the client's location, or the nearest possible point of delivery. This gives a huge competitive edge for transporting rings of up to 10,000 mm diameter anywhere in the world.

euskalforging is present in the most critical environments of offshore upstream as well as downstream.

In the upstream euskalforging supplies rings for:

  • Winches
  • Floating platforms (TLPs)
  • FPSO

In the downstream euskalforging supplies rings for:

  • Heat exchangers
  • Oil and gas pipeline closures
  • Valves
  • Reactors
  • Autoclaves
  • Coke drums

Key projects

Coke drums

Year: 2018
Destination: Croatia
End Client: Gunvor Petroleum Rotterdam
Grade: SA-336M F11 Clase 3
Scope:

  • 2 rings ø 9414/8947 x 727 mm

Completion period: 5 months

Refinery in Japan

Year: 2016
Destination: Japan
End client: JX Nippon Oil and Energy Co.
Grades: SA-336 Gr F12
Scope:

  • Two rings of ø 7725/7282 x 632 mm for two Coke Drums

Completion period: 3 months

Refinery in Antwerp

Year: 2015
Destination: Belgium
End client: ExxonMobil
Grades: SA336 F1
Scope:

  • Four rings of ø 9626/9266 x 742 mm for four Coke Drums

Completion period: 3 months

Reactor

Year: 2014
Destination: Germany
End client: Unknown
Grades: SA336 F1 Cl3 and SA350LF2
Scope:

  • One ring of ø 7560/7365 x 508 mm
  • Two rings of ø 7200/6860 x 256 mm
  • One ring of ø 5985/5850 x 465 mm

Completion period: 2 months

Mariyskiy refinery

Year: 2014
Destination: Russia
End client: Unknown
Grades: SA336 F11 Cl3
Scope:

  • Two rings of ø 7008/6536 x 685 mm for two Coke Drums

Completion period: 2 months

Moho Nord

Year: 2013
Destination: Congo
End client: Total
Grades: A694 F52, A694 F60 & A694 F70
Scope:

  • 16 rings of ø 1055/666 x 290 mm for the TLP (Tension Leg Platform)
  • 16 rings of ø 1176/825 x 195 mm for the TLP (Tension Leg Platform)
  • 16 rings of ø 1500/845 x 280 mm for the TLP (Tension Leg Platform)

Completion period: 4 months

Traction Winches FPSO

Year:: 2013
Destination: Korea
End client: DSME/Technip
Grades: 42CrMo4
Scope:

  • Eight finished gears of ø 2710/1824 x 250 mm

Completion period: 3 months

Cartagena refinery

Year: 2012
Destination: Japan/Spain
End client: Repsol
Grades: A266 Gr2
Scope:

  • 7 rings with an outer diameter ranging between ø 6963 mm and ø 6628 mm for autoclaves

Completion period: 4 months

Saudi Aramco refinery

Year: 2012
Destination: Saudi Arabia
End client: Saudi Aramco
Grades: SA266CL2
Scope:

  • 8 rings of ø 4446/3840 x 242 mm for the heat exchangers

Completion period: 2 months

El Segundo refinery

Year: 2011
Destination: USA
End client: Chevron
Grades: SA336 F11 Cl3
Scope:

  • 6 rings of ø 8014/7742 x 423 mm for six Coke Drums

Completion period: 2 months

PAZFLOR

Year: 2011
Destination: Angola
End client: Total
Grades: SA355K2
Scope:

  • 16 rings of ø 1500/800 x 105 mm
  • 16 rings of ø 1470/1170 x 105 mm
  • 16 rings of ø 1270/900 x 105 mm

Completion period: 2 months

Clients

shell

SPX

Emerson

Man

Idesa

Kobelco

National Oilwell Varco

thermodyn

techlam

sumitomo   ge-oil   larsen

asturfeito

End clients

statoil

repsol

total

exxon

chevron

saudi-aramco

fluor

technip

subsea-7

  SBM offshore

  sacryflour

  amec